Our Services

Get 15% Discount on your First Order

[rank_math_breadcrumb]

Management Question

Description

•You must refer to the case that I attached with the assignment.

  • •Each answer should be within the range of 250 to 300 word counts.
  • Please support your answers with examples and clear explanation.
  • Avoid originality, similarity and plagiarism, Do not copy or quote from any sources and you must paraphrase.
  • All references must be cited using APA format.
  • All answered must be typed using Times New Roman (size 12, double-spaced) font. No pictures containing text will be accepted
  • ‫المملكة العربية السعودية‬
    ‫وزارة التعليم‬
    ‫الجامعة السعودية اإللكترونية‬

    Kingdom of Saudi Arabia
    Ministry of Education
    Saudi Electronic University

    College of Administrative and Financial Sciences

    Assignment-2
    MGT425-Spreadsheet Decision Modeling
    Due Date: 22/03/2025 @ 23:59 (End of Week 9)
    Course Name: Spreadsheet Decision
    Modeling
    Course Code: MGT425

    Student’s Name:

    Semester: Second

    CRN: 23745

    Student’s ID Number:

    Academic Year: 2024-2025 (1446 H)

    For Instructor’s Use only
    Instructor’s Name: Dr. Shahid Husain
    Students’ Grade: Marks Obtained / Out of 10 Level of Marks: High/Middle/Low
    General Instructions – PLEASE READ THEM CAREFULLY







    Restricted – ‫مقيد‬

    The Assignment must be submitted on Blackboard (WORD format only) via
    allocated folder.
    Assignments submitted through email will not be accepted.
    Students are advised to make their work clear and well presented; marks may be
    reduced for poor presentation. This includes filling your information on the cover
    page.
    Students must mention question number clearly in their answer.
    Late submission will NOT be accepted.
    Avoid plagiarism, the work should be in your own words, copying from students
    or other resources without proper referencing will result in ZERO marks. No
    exceptions.
    All answered must be typed using Times New Roman (size 12, double-spaced)
    font. No pictures containing text will be accepted and will be considered
    plagiarism).
    Submissions without this cover page will NOT be accepted.

    Course Learning Outcomes-Covered
    Course Learning Outcomes (CLOs)

    Question

    Find some structured ways of dealing with complex managerial
    decision problems.
    Explain simple decision models and management science ideas
    that provide powerful and (often surprising) qualitative insight
    about large spectrum of managerial problems.
    Demonstrate the tools for deciding when and which decision
    models to use for specific problems.
    Build an understanding of the kind of problems that is tackled
    using Spreadsheet Modeling and decision analysis.

    Question-1

    Aligned (PLOs)
    MGT.K.1
    (1.1)
    MGT.K.3
    (1.2)
    MGT.S.1
    (2.1)
    MGT.V.1
    (3.1)

    Question-3

    Question-4
    Question-2

    Assignment Instructions:
    Assignment Questions: (Marks 10)
    PART-A:
    Business Analysis using Spreadsheets (Critical Thinking)
    Question 1: In context of Business Analysis using Spreadsheets, Discuss the various
    categories of Business Analysis that are required for detailed analysis by Business Analysts
    (250-300 words) (2.5 Marks)..

    PART-B: (Case Study)
    • Log in to Saudi Digital Library (SDL) via University’s website
    • On first page of SDL, choose “English Databases”
    • From the list find and click on EBSCO database.
    • In the Search Bar of EBSCO find the following article:
    Title: “An Analytic Hierarchy Process Approach in Decision-Making for Material
    Selection in an Automotive Company: A Case Study”
    Author: Cheng Jack Kie, Ahmed Khalif, Norhana Mohd Aripin, Rafiuddin Mohd Yunus.
    Date: August 18, 2019

    Read the above case study and answer the following Questions:
    2. Discuss the Analytic Hierarchy Process that can assist decision-makers and
    continuous improvement managers. (250-300 words) 2.5 Marks.

    Restricted – ‫مقيد‬

    3. What is the importance of employee involvement in process of continuous
    improvement to be successful in manufacturing companies? (250-300 words) 2.5
    Marks

    4. Discuss the four criteria that are the most important and needed to be considered
    when selecting the material to use in the fabrication process. (250-300 words) 2.5
    Marks

    Answers:
    1
    2
    3
    4

    Restricted – ‫مقيد‬

    FGIC2019
    FGIC 2nd Conference on Governance and Integrity 2019
    Volume 2019

    Conference Paper

    An Analytic Hierarchy Process Approach in
    Decision-Making for Material Selection in an
    Automotive Company: A Case Study
    Cheng Jack Kie, Ahmed Khalif Hassan, Norhana Mohd Aripin, and Rafiuddin
    Mohd Yunus
    Faculty of Industrial Management, Universiti Malaysia Pahang, Lebuhraya Tun Razak, 26300
    Gambang, Kuantan, Pahang

    Abstract

    Corresponding Author:
    Cheng Jack Kie
    [email protected]
    Received: 5 August 2019
    Accepted: 14 August 2019
    Published: 18 August 2019
    Publishing services provided by
    Knowledge E

    This study is an approach to investigate and to choose the suitable material for the
    fabrication of tools trolley to ensure the good quality of the product. The project team
    of an automotive manufacturing company is planning to fabricate 100 sets of tools
    trolley in the assembly shop. This study was developed to describe an approach based
    on Analytic Hierarchy Process (AHP) that can assist decision-makers and continuous
    improvement engineers in determining the most suitable material to be employed in
    fabrication process at the early stage of the product development to reduce the cost.
    The selected main criteria are Material Strength, Material Cost, Procurement Lead Time
    and Duration of Fabrication Process while the four materials that will be considered in
    this study are Aluminium, Steel Tube, and Square Tube. Finally, the results show that
    Square Tube is recommended as the most suitable material for the in-house tools for
    trolley fabrication.

    Keywords: analytic hierarchy process, decision-making, continuous improvement,
    fabrication process.

    Cheng Jack Kie et al. This
    article is distributed under the
    terms of the Creative Commons
    Attribution License, which
    permits unrestricted use and

    1. Introduction

    redistribution provided that the
    original author and source are
    credited.
    Selection and Peer-review under

    Material process selection is a method to determine the most suitable material to
    fabricate a product. Many researchers have agreed on the importance of material

    the responsibility of the

    selection process, especially during the early stage of the product development phase.

    FGIC2019 Conference

    Determining the most suitable and appropriate material in the early stage can avoid

    Committee.

    additional cost if changes are needed to be carried out after the early stage of the
    product development process (Ravisankar, Balasubramanian & Muralidharan, 2004).
    However, it is a difficult task with a complex decision because various factors have to
    be considered during the process.
    Analytic Hierarchy Process (AHP) is a tool that can be used at the conceptual
    design stage in the product development process (Hambali et al., 2010; Subramanian &

    How to cite this article: Cheng Jack Kie, Ahmed Khalif Hassan, Norhana Mohd Aripin, and Rafiuddin Mohd Yunus, (2019), “An Analytic Hierarchy
    Process Approach in Decision-Making for Material Selection in an Automotive Company: A Case Study” in FGIC 2nd Conference on Governance Page 472
    and Integrity 2019, KnE Social Sciences, pages 472–484. DOI 10.18502/kss.v3i22.5067

    FGIC2019

    Ramanathan, 2012). According to Vaidya and Kumar (2006), AHP is widely implemented
    for selection and evaluation based decision-making, usually in the area of manufacturing, engineering, healthcare, education, and many more. AHP has been used to
    solve multi-criteria decision-making problems based on experience and skills of the
    experts by determining the factors that impacted the decision process (Subramanian
    & Ramanathan, 2012). The tools trolley which acts to transport tools and small parts
    safety is generally made from few materials such as stainless steel, carbon steel,
    aluminum, iron, and copper. Each material has different material strength, material lead
    time, and the price of the material can be very expensive to manipulate the cost. In
    the fabrication process, there are many processes involved with different amounts of
    costs of material and equipment, quality of material, and fabricating time (Kalpakjian
    and Schmid, 2014). In an automotive manufacturing industry, the fabrication process
    gives the Continuous Improvement (CI) Engineers different types of problems, where
    the selection of appropriate material is one of the critical issues. By doing this study,
    the problem faced by the engineers is solved using AHP. This technique will assist in
    determining the most appropriate material to fabricate the tools trolley, which will meet
    the product’s specifications and requirements. Thus, the main focus of this study is to
    explore the potential use of AHP in assisting CI projects to evaluate and determine
    the most appropriate material for producing tools trolley in an automotive company.
    Besides that, this paper briefly reviews the concepts and applications of multiple
    criterion decision analysis.
    This paper is organized into five sections where after the broad introduction was firstly
    discussed in Section 1. The literature of past studies related to AHP and Continuous
    Improvement are presented in Section 2. Next, the chosen methodology, which is AHP,
    will be elaborated in Section 3 while Section 4 encompassed results and discussion.
    Then, a conclusion with the point of discussion on limitations and suggestion for future
    studies are provided in the last section of this paper.

    2. Literature Review
    In order to make a good decision, the decision-maker must be able to first define
    the problem, the need, and purpose of the decision, then using this information to
    develop criteria that can be used to evaluate the potential alternative actions to take.
    The beauty of Analytic hierarchy process and continuous improvement are discussed
    in the following section, respectively.

    DOI 10.18502/kss.v3i22.5067

    Page 473

    FGIC2019

    2.1. Analytic hierarchy process
    Dweiri and Al-Oqla (2006) mentioned that the Analytic Hierarchy Process (AHP) is one
    of the multi-criteria decision-making tools that incorporated the behavior of its decisionmaker in the decision model. Professor Thomas L. Saaty developed AHP techniques in
    the 1970s to improve the decision-making process when multiple criteria are involved
    in the process. Since then, the method is widely used, refined, and studied. AHP
    technique is one of the most commonly used multi-criteria decision methods in decision
    making (Subramanian & Ramanathan, 2012). The main flexibility of this method is AHP
    considered a systematic approach that includes both the tangible and intangible factors
    and finally provides a structured solution to problems in the industries.
    The advantages of AHP method is the technique uses both qualitative data collected
    from judgment values which based on experience and intuition apart from quantitative
    data of a problem (Subramanian & Ramanathan, 2012; Vaidya & Kumar, 2006). Besides
    that, the application of AHP allows the investigated problems to be broken down
    hierarchically where a set of criteria will be arranged in a hierarchy order so that it can
    be evaluated subjectively based on the importance according to scores or weights. To
    develop an AHP model, there are three important phases which are problem structuring,
    judgments comparison, and analyzing priorities. In the structuring phase, a decisionmaking model is developed and then is transposed to a hierarchy form. Then, for each
    alternative obtained will be evaluated according to the criterion’s weight in the judgment
    phase.
    A hierarchy can be used to study the interaction of its components and how these
    interactions impact the whole system. Therefore a hierarchy is one form of abstraction
    or representation of a system’s structure (Hambali et al., 2010). Hierarchies work by
    separating the reality of human thinking into several sets and subsets. The decision
    making alternatives can be rated once weights are assigned to the developed hierarchy.
    Weights are assigned through expert comparison using judgment scale. These scales
    are usually ranged from 1 (equally preferred) to 7 (extremely preferred). These numerical
    values represent the intensity of the alternatives compared to criteria.
    Due to the mathematical elements used in AHP, researchers are keen to adopt
    the technique (Dweiri & Al-Oqla, 2006; Hambali et al., 2008). With the properties of
    using multi-level objectives, criteria, sub-criteria, and alternatives, AHP is suitable to
    be used to solve decision problem. Through pairwise comparison, data are obtained
    using weightage of the importance of the criteria and the alternatives in terms of each
    decision criteria.

    DOI 10.18502/kss.v3i22.5067

    Page 474

    FGIC2019

    AHP is also commonly applied in task selection where the method is used not
    to find the correct answer but to aid decision-makers finding the best answer. Not
    only for academic studies, but AHP is also widely used in organizations, especially
    for an organization to explore their strategies and their competitors (Vaidya & Kumar,
    2006). AHP is suitable to be used to groups of decision-makers who shared common
    objectives, worked in a cooperative environment and of the same status.

    2.2. Continuous improvement (CI)
    Currently, the implementation of sustainable improvement is gaining increase attention (Bhasin, 2008; Hassini, Surti & Searcy, 2012). With that, several guidelines were
    developed to support continuous improvement implementation (Sundar, Balaji & Kumar,
    2014). Strategic Management, Kaizen, Six Sigma, and Total Quality Management are
    some of the well-known methods used in continuous improvement (Garcia, Rivera &
    Iniesta, 2013). Each of these methods uses different tools for improvement.
    One way for the continuous improvement to be successful, there is a need to include
    staff involvement. With that, Total Quality Management adopts tools and plan of doing,
    check, act approach (Moeuf et al., 2016) that are capable of integrating learning culture
    to drive organization change (Amirteimoori, Despotis & Kordrostami, 2014; Moeuf et al.,
    2016). On the other hand, Six Sigma approach aims at reducing variability in organizational processes through the defining, measuring, analyzing, improving and controlling
    improvement cycle are used to support this approach (Garcia, Rivera & Iniesta, 2013). As
    for Kaizen, this tool adopted scenario that allows continuous improvement in personal,
    family, social, and work-life (Anand & Kodali, 2008) which aimed to change for the better
    (Bhasin, 2008; Gupta & Jain, 2013). However, there are researchers that mentioned that
    Kaizen is not only a continuous improvement tool, but it also serves as the means
    and result of human and non-human resources management in the pursuit of business
    excellence (Hassini, Surti & Searcy, 2012).
    As such, a vast literature argues that characteristically the tools that support Kaizen
    are process-oriented and human-based, as Kaizen is incremental, continuous, and
    participatory (Anand & Kodali, 2008; Moeuf et al., 2016; Zhang et al., 2012). Therefore,
    Kaizen, as a continuous improvement tool, stressed that efforts of all people involved
    in the organization are important to achieve the improvements that can contribute to
    the achievement of superior results (Hassini, Surti & Searcy, 2012; Sundar, Balaji &
    Kumar, 2014), while understanding management as the maintenance and improvement
    of working standards (Amirteimoori, Despotis & Kordrostami, 2014).
    DOI 10.18502/kss.v3i22.5067

    Page 475

    FGIC2019

    3. Methodology
    This case study was done in an automotive manufacturing company in Pahang. Moving
    forward towards the lean manufacturing concept, the company is encouraging continuous improvement projects and activities. In a lean manufacturing concept, reducing
    waste and increasing value-adding operation time is the main target. To reduce the
    waste of walking in the production time, fabrication of tools trolley was proposed to
    increase the efficiency rate. The project team is planning to fabricate 100 sets of tools
    trolley (shown in Figure 1) in the assembly shop for the used in the assembly line.

    Figure 1: Tools Trolley in an Assembly Shop (Source: Authors’ own work).

    As the company, in-house Continuous Improvement (CI) Workshop has the capacity of
    fabricating the trolley. Therefore CI-engineers need to plan on the design and choose
    the correct material for the trolley. All fabrication tools and machine such as cutting
    machine, tightening tools, welding machines, and measuring devices are available in
    the workshop. The material for the fabrication must be strong to withstand the weight of
    the tools, equipment, and some fittings parts. Project lead time is short. Therefore the
    procurement and fabrication lead time must be minimized to ensure the project completion is on schedule. Material cost should also be within the budget allocation. The data
    collection phase is crucial in any research. Several aspects come into play in the data
    DOI 10.18502/kss.v3i22.5067

    Page 476

    FGIC2019

    collection process. The three most crucial aspects are the cost of the selected data
    collection method, the accuracy of data collected, and the efficiency of data collection.
    In this study, data were collected via structured, face-to-face interviews. The interview
    session was conducted with the participation of Project Engineers, Project Leaders,
    Continuous Improvement Operators, and Assembly Operators. All the participants are
    involved in the tools trolley project. A pilot test to validate the questionnaires was
    conducted with two Managers, and some amendments have been made based on the
    given feedback. Besides that, the researcher also reviewed a few products’ catalogs
    that describe in details about each material specification to developed comprehensive
    criteria and alternatives. Information collected from the participants via interview is
    gathered to determine which criteria are the most important in deciding which material
    to select for tools trolley fabrication. With the information gathered, the AHP method
    can be performed. AHP is a decision-making tool that involves structuring criteria into a
    hierarchy and the relative importance of these criteria is then assessed. Alternatives for
    each criterion are compared, that relies on the judgment of the interviewed participants.
    An overall ranking scale of the alternatives is determined.
    The AHP selection method follows the following steps. Firstly, define the objective
    of selection, follows by developing a hierarchical framework based on the collected
    information on criteria and alternatives, construction of pairwise comparison set matrix,
    calculation of preferences against criteria of pairwise comparison, ranking the criteria,
    developing an overall priority ranking, performing a consistency check on the result
    and finally selection of the best alternatives.

    4. Results and Discussion
    The main purpose of this study is selecting the most suitable material for the fabrication
    process of the tool trolley in order to produce a good quality product. From the interview
    conducted with the Project Engineers, Project Leaders, Continuous Improvement Operators, and Assembly Operators, information on criteria and alternatives are successfully
    gathered. The selected main criteria are Material Strength, Material Cost, Procurement
    Lead Time, and Duration of Fabrication Process. According to the participants, these
    four criteria are the most important and needed to be considered when considering
    which material to use in the fabrication process of the tool trolley. As for the alternatives,
    Aluminium, Steel Tube, and Square Tube are chosen by the participants as the potential
    materials that can be considered in order to construct the tool trolley. The defined
    objective, four different criteria, and three possible alternatives are shown in Figure 2.
    DOI 10.18502/kss.v3i22.5067

    Page 477

    FGIC2019

    Figure 2: Hierarchy Structure of the Criteria (Source: Authors’ work).

    4.1. Pairwise comparison
    The score of each criterion was calculated using pairwise comparison. The decision
    was done by comparing two alternatives against one criterion, and then the indicated
    preferences will be recorded. The pairwise comparison scale measurement that was
    used is shown in Table 1.
    Table 1: Pairwise Comparison Scale.
    Preference Level

    Numeric Value

    Equally Preferred

    1

    Moderately Preferred

    2

    Strongly Preferred

    3

    Very strongly Preferred

    4

    Extremely Preferred

    5

    Source: Taylor (2019)

    Table 3 depicted the pairwise comparison of alternatives (Aluminium, Steel Tube, and
    Square Tube) against criteria (Material Strength, Material Cost, Procurement Lead Time
    and Fabrication Lead Time). The data collected are based on the expert judgment of
    the participants during the interview.

    Figure 3: Result for All Criterion (Source: Authors’ own work).

    DOI 10.18502/kss.v3i22.5067

    Page 478

    FGIC2019

    4.2. Calculation of preferences
    The next step in AHP is to prioritize the decision alternatives within each criterion.
    This will assist the CI-engineers in determining the most suitable material based on the
    criteria provided. Preference score result and normalized matrix with row average were
    calculated as shown in Figure 4.
    From Figure 4, the calculated results showed that for the criteria of Material Strength,
    Square Tube is the most preferred alternative with the score of 0.67, followed by
    Aluminium and Steel Tube with the score of 0.23 and 0.10 respectively. For the second
    criteria, Procurement Lead Time, Square Tube scored the highest at 0.57, followed by
    Steel Tube with 0.33 and Aluminium with 0.09. The third criteria, Material Cost shows
    that the participants agreed that Square Tube with the score 0.47 is the most costeffective as compare to Steel Tube and Aluminium with the score of 0.43 and 0.10. For
    the Fabrication Lead Time, as the last criteria are chosen by the participant, Aluminium
    was ranked first with 0.62, followed by Steel Tube and Square Tube with 0.28 and
    0.096 respectively.

    Figure 4: Comparison of Criteria against Alternatives Normalize Matrix (Source: Authors’ own work).

    After determining the preference of materials against the chosen four criteria, next
    is to determine among the four criteria, which criteria is the most important to the least
    important where these criteria will be the major reason which material will be chosen for
    the fabrication of tools trolley. With the relative importance or weight of the criteria used
    to rank the criteria from the most important the least important, the result of the ranking
    and normalize matrix of the chosen four criteria are shown in Figure 5. Results in Figure
    5 indicated that among the four criteria, Fabrication Lead Time with the score of 0.44 is
    considered the most important criteria in determining which material to choose for tool
    DOI 10.18502/kss.v3i22.5067

    Page 479

    FGIC2019

    trolley fabrication. The second most important criteria are the Material Cost (score of
    0.24). Material Strength and Procurement Lead Time scored 0.19 and 0.13, respectively.

    Figure 5: Criteria Normalize Matrix (Source: Authors’ own work).

    4.3. Overall ranking
    As the preference of materials (alternative) against the chosen four criteria (Figure 4)
    and the preferable criteria (Figure 5) are determined, the next step is to determine given
    all the preferences calculation and ranking, ultimately which material should be chosen
    to fabricate the tools trolley. Hence, an overall score of each criterion is computed by
    multiplying the values in the criteria preference vector by the preceding criteria matrix
    and summing the products as in Figure 6.
    Figure 6 showed the overall ranking of the three materials. Based on the result,
    Square Tube ranked the highest with 0.36 as compared to Aluminium with a score of
    0.35 and Steel Tube with a score of 0.29. As Square Tube scored the highest, Square
    Tube should be selected as the most suitable material for the in-house tools trolley
    fabrication, followed by Aluminium and Steel Tube.

    4.4. Consistency check
    The last step in AHP is to check the level of consistency of the developed pairwise
    comparison matrixes so that the results are reliable and can be recommended to
    the management for decision making. The degree of consistency for the pairwise
    DOI 10.18502/kss.v3i22.5067

    Page 480

    FGIC2019

    Figure 6: AHP Overall Ranking (Source: Authors’ own work).

    comparison in the decision criteria matrix is determined by computing the ratio of
    Consistency Index (CI) to Random Index (RI).
    CI/RI = 0.06593/0.90 = 0.07326
    In this case study, the consistency result is 0.07326, which is
    Purchase answer to see full
    attachment

    Share This Post

    Email
    WhatsApp
    Facebook
    Twitter
    LinkedIn
    Pinterest
    Reddit

    Order a Similar Paper and get 15% Discount on your First Order

    Related Questions

    It352 project 1

    Description see all d College of Computing and Informatics Project Deadline: Monday 04/21/2025 @ 23:59 [Total Mark is 14] Student Details: CRN: Name: Name: Name: ID: ID: ID: Instructions: • You must submit two separate copies (one Word file and one PDF file) using the Assignment Template on Blackboard via

    Management Question

    Description No coping 🙏 ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment 2 MGT101 (2nd Term 2024-2025) Deadline: 22/03/2025 @ 23:59 (To be released to students on BB in Week 6) Course Name:

    Management Question

    Description Nocoping 🙏 ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment 2 Introduction to International Business (MGT 321) Due Date: 22/03/2025 @ 23:59 Course Name: Introduction to International Business Course Code: MGT321 Student’s

    Management Question

    Description no coping 🙏 ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment 2 Organizational Behaviour (MGT 301) Due Date: 22/03/2025 @ 23:59 Course Name: Organizational Behaviour Student’s Name: Course Code: MGT301 Student’s ID

    Management Question

    Description No coping 🙏 ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment 2 Introduction to International Business (MGT 321) Due Date: 22/03/2025 @ 23:59 Course Name: Introduction to International Business Course Code: MGT321

    Management Question

    Description Nocoping 🙏 ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment 2 Logistics Management (MGT 322) Due Date: 22/03/2025 @ 23:59 Course Name: Student’s Name: Course Code: MGT322 Student’s ID Number: Semester: Second

    Mgt 323. ( 2)

    Description Learning Goal: I’m working on a management multi-part question and need support to help me learn. Students are advised to make their work clear and well presented; marks may be reduced for poor presentation. This includes filling your information on the cover page. Students must mention question number clearly

    Mgt 324 (2 )

    Description Learning Goal: I’m working on a management multi-part question and need support to help me learn. Students are advised to make their work clear and well presented; marks may be reduced for poor presentation. This includes filling your information on the cover page. Students must mention question number clearly

    Mgt 325 (2 )

    Description Learning Goal: I’m working on a management multi-part question and need support to help me learn. Students are advised to make their work clear and well presented; marks may be reduced for poor presentation. This includes filling your information on the cover page. Students must mention question number clearly

    Mgt 403 (2)

    Description Learning Goal: I’m working on a management multi-part question and need support to help me learn. Students are advised to make their work clear and well presented; marks may be reduced for poor presentation. This includes filling your information on the cover page. Students must mention question number clearly

    MGT 404 (2)

    Description Learning Goal: I’m working on a management multi-part question and need support to help me learn. Students are advised to make their work clear and well presented; marks may be reduced for poor presentation. This includes filling your information on the cover page. Students must mention question number clearly

    MGT 424 (2)

    Description Learning Goal: I’m working on a management multi-part question and need support to help me learn. Students are advised to make their work clear and well presented; marks may be reduced for poor presentation. This includes filling your information on the cover page. Students must mention question number clearly

    Project 232

    Description see all de College of Computing and Informatics Project Deadline: Sunday 20/04/2025 @ 23:59 [Total Mark is 14] Student Details: CRN: Name: Name: Name: ID: ID: ID: Instructions: • You must submit two separate copies (one Word file and one PDF file) using the Assignment Template on Blackboard via

    I need complete tyaping the information.

    Description Starting from patient 10in word Page 20 full the information from the pdf file page number 22 It is 20 patients i do 9 patients. Just complete. ‫بيانات مرضى السكري يوجد لديهم مضاعفات‬ ‫بالكلى‬ ‫ادارة الطب االتصالي بتجمع المدينة المنورة‬ Here is the content from the table, classified into

    Business Question

    Description 0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism0% Plagiarism Follow all file instructions, terms, and word count. I will attach the

    Typing

    Description Starting from patient 10in word Page 20 full the information from the pdf file page number 22 It is 20 patients i do 9 patients. Just complete. ‫بيانات مرضى السكري يوجد لديهم مضاعفات‬ ‫بالكلى‬ ‫ادارة الطب االتصالي بتجمع المدينة المنورة‬ Here is the content from the table, classified into

    Management Question

    Description •You must refer to the case that I attached with the assignment. •Each answer should be within the range of 250 to 300 word counts. Please support your answers with examples and clear explanation. Avoid originality, similarity and plagiarism, Do not copy or quote from any sources and you

    MGT 402-Entrepreneurship and small business

    Description The Assignment must be submitted on Blackboard (WORD format only) via allocated folder. Assignments submitted through email will not be accepted. Students are advised to make their work clear and well presented; marks may be reduced for poor presentation. This includes filling your information on the cover page. Students