Our Services

Get 15% Discount on your First Order

[rank_math_breadcrumb]

592 W8

2

INTRODUCTION (~1 page)

Undoubtedly, what we know as conventional project management is continuing to evolve as a result of an ever changing and increasingly complex environment in today’s society (Jaafari, 2003). By definition, project management is the application of knowledge, skills, and tools necessary to achieve the project’s requirements. The knowledge, skills, and tools are usually grouped into activities or processes. Some of the activities within these groups included project initiation, project planning, project execution, project monitoring and control, and project closure (Kerzner, 2022). The introduction of hybrid and agile methodologies has allowed transformation in the world of project management, yielding increased collaboration, flexibility and when requirements are unclear or risk is high, also considering if technology will be uses and he size and skill level of teams (Tarne, 2007). The dynamic impact of agile methodologies of project management were illustrated in the mega construction project of the Mercedes-Benz Stadium in Atlanta, Ga. 

This project was an 11-year vision in the making, where NFL team owner of the Falcons, Arthur Blank, broached the idea of a new stadium to replace the old Georgia Dome. The initial plan for this build were slated for 36 36-month project with a budget of $1M; howeve,r due to poor planning and complexities with the 8-panel retractable roof, this project resulted in being over 40 months and over $500K over budget. In our project analysis and literature review we will deep dive into the dynamics of the project as it relates to the project management principles, domains and AI-driven program management systems.

PROBLEM STATEMENT (~1 page)

Problem Statement: Mercedes-Benz Stadium Project

The construction of the Mercedes-Benz Stadium in Atlanta, Georgia, stands as a powerful example of both architectural ambition and project management complexity. Envisioned as a groundbreaking sports and entertainment facility, the project aimed to become the home of the NFL’s Atlanta Falcons and MLS’s Atlanta United, offering cutting-edge features like a retractable roof and a 360-degree halo video board. However, despite the innovation, the stadium project faced considerable cost and schedule challenges. Initially budgeted at $1 billion, the final costs ballooned to approximately $1.6 billion, representing a 60% increase in expenses. Likewise, the scheduled opening was pushed back several times, with an original completion date in March 2017 that was delayed until August 2017. These issues resulted in missed events, rushed planning for sports seasons, and significant stress on project stakeholders. Such setbacks raise fundamental concerns about the project’s cost control, scheduling accuracy, and risk management practices.

At the core of the issue was the failure to adequately forecast and control costs related to the stadium’s complex features, most notably, the retractable roof. The design, though visually striking and innovative, introduced considerable engineering and coordination difficulties. As construction progressed, unexpected technical setbacks emerged, particularly in the alignment, control systems, and movement mechanics of the roof panels. These delays not only disrupted the construction schedule but also caused cascading delays across other project components. Budget allocations that were not initially forecasted had to be redirected toward resolving technical issues, leading to financial strain and stakeholder dissatisfaction. Further, the continuous redesigns and late-stage engineering decisions compounded the difficulty of maintaining a clear project baseline, making earned value analysis (EVA) and other control methods harder to implement effectively.

The significance of this problem extends far beyond a single project. The Mercedes-Benz Stadium is an example of how poor cost estimation, scope creep, and inadequate risk response can derail even the most well-funded and high-profile initiatives. For future projects, especially those involving public-private partnerships or large-scale infrastructure, this case serves as a cautionary tale on the importance of strict change control processes, realistic scheduling, continuous risk analysis, and effective stakeholder communication. Stronger adherence to project management principles and better integration of predictive analytics tools could have mitigated these issues. Ultimately, understanding how and why this project went over budget and beyond schedule offers valuable lessons in avoiding similar pitfalls in future endeavors.

 
Literature Review: Mercedes-Benz Stadium Project 

The mega construction project of the Mercedes-Benz Stadium, located in Atlanta, Georgia, is one fine example that highlights complexities in modern project management with cost estimation, schedule overruns, and risk management. This mega project has cost nearly $1.6 billion against an initial figure of $1 billion, translating to around 60% cost overrun. There have also been significant delays regarding the completion of this project. Construction was initially scheduled to be finished by March 2017, but the date was later moved to August 2017. The reason for these challenges is related to constructing a retractable roof, a significant part of the stadium, which has proven to be a high-risk project area in terms of planning and execution. This literature review would strive toward detail on cost overruns, schedule discrepancies, and better project management practices.

Cost and Schedule Discrepancies

            The discrepancies between expected project outcomes and the final results concerning costs or schedules are significant issues in constructing the Mercedes-Benz Stadium. The stadium’s budget and management were revised repeatedly because of specific unforeseen technical challenges, with one prominent example being the integration of the retractable roof, which is one aspect of the project. The development costs increased by $600 million, mainly attributable to unforeseen technical problems in engineering and designing the roof (Post, 2017). It was expected to be finished as part of the original 36-month timeline, but numerous delays pushed the completion date out by more than 40 months (Kerzner, 2022). These are prime examples of poor cost forecasting, scope creep, and ineffective change control during the project.

(Tolleson et. al., 2019)

The Impact of the Project Management Principles

            The management of the Mercedes-Benz Stadium project had key issues concerning several project management principles, such as risk management, change management, and stakeholder communication. The issue of risks related to the retractable roof was poorly managed and forecasted, and became a central issue, causing delays and overruns in schedule and cost. According to Jaafari (2003), a proactive approach to identifying and addressing risks is indispensable in megaprojects, which was absent from the Mercedes-Benz Stadium project. Instead, the project suffered endless redesign and late-stage engineering decisions, aggravating a bad situation. Furthermore, the project was poor in change control processes; hence, it was poorly integrated with project scope and timeline adjustments.

            Stakeholder communication was one of the keys to the project’s problems. The failure to deliver the venue on time impeded many events, resulting in dissatisfaction among affected stakeholders like the NFL, Atlanta United, and the local government. Good stakeholder management entails excellent communication and realistic expectations, which were absent in this instance (Tarne, 2007). The absence of continuous transparent communication with stakeholders resulted in enormous stress and misalignment on deliverables, which in turn caused frustration and mismanagement of project goals.

Risk Management and the Role Played by the AI-Driven Systems

                The complexity surrounding the Mercedes-Benz Stadium could have been managed much better through appropriate risk management strategies and, much more significantly, AI-assisted project management systems. AI and program management systems are crucial components in the modern-day management of large construction projects (Georgiev, S. et. al., 2024). These systems usually provide predictive analytics that identify possible risks, offering a better means of managing resources and timelines most effectively (Kerzner, 2022). For example, in the case of the Mercedes-Benz Stadium, AI systems could have been used to determine and alleviate risks concerning retractable roof complexity so that there were not many chances for cost overruns and project delays. As per Jaafari (2003), the lack of early intervention through predictive tools resulted in the stadium undergoing enormous unforeseen problems that could have been avoided through better planning.

        
Stakeholder Management and Communication

            Successful completion of any project, particularly a big one, most notably the Mercedes-Benz Stadium, is hinged on worthy stakeholder management. Poor communication with the NFL and local communities further worsened the project’s problems. A thorough understanding of the stakeholders’ needs and timely updates would have led to a more collaborative atmosphere in which problems could have been solved in real-time instead of allowing the issue to escalate (Tarne, 2007). Moreover, stakeholder expectations could have been better managed through realistic milestone setting and clear, consistent communication throughout the process. As post-construction reviews have indicated, the stadium would prove a disruption in different event calendars to the detriment of all stakeholders.

The Cost Control and the Scheduling Practices

            Cost overruns and scheduling concerns regarding the Mercedes-Benz Stadium emphasize the necessity for strict measures for managing costs and project schedules. The original estimation considered the technological and engineering difficulties of the retractable roof to be insufficient and slight in planning. Instead, the project engendered many redesigns and adaptations that raised costs, thus displaying initial planning defects (Post, 2017; Kerzner, 2022). Such miscalculations could have been prevented through a detailed cost estimating model where earned value analysis (EVA) would help track the project’s performance against budget and timeline. EVA compares actual accomplishments of work with the planned progress, enabling the project manager to have clarity on what went awry and when and whether corrective action is required.

Recommendations for the Future Practice

            The setbacks in constructing the Mercedes-Benz Stadium offer many lessons for future mega construction projects. First and foremost, there should be a strategic formulation of risk management for all contributions to such complex technological facilities as retractable roofs. The future of construction has to be characterized by introducing AI applications in project management for better cost and schedule forecasting, lowering the chances of surprises. Another important recommendation is to ensure early integration of change control into the project lifecycle to control scope creep and manage stakeholder expectations. In addition, more direct and improved communication with stakeholders during the project’s entire life would manage any misalignment with respect to goals and expectations and create an environment that fosters proactive problem solving.

Conclusion

            The project of Mercedes-Benz Stadium has been shown to encapsulate a scenario where cost overruns, schedule extensions, and poor practices together can have a powerful effect on construction projects, massive infrastructures. Those issues that could have been alleviated by applying prime project management principles, such as risk management, stakeholder communication, and cost control, would have nipped them in the bud. Some lessons emerging from that project deal with calls for using predictive tools such as AI-powered systems, tighter change control procedures, and ensuring that appropriate, realistic expectations of stakeholders are established. These insights will be the most important within the project management field as time progresses in terms of managing future mega projects, ensuring that they are always on the right track and within budget constraints.

· Complete Recommendations (Two pages) based on the above paper. Must have atleast 2 references.

REFERENCES 

Jaafari, A. (2003). Project Management in the Age of Complexity and Change. 

Project Management Journal, 34(4), 47-57. A

(Original work published 2003)

https://www.commissioning.org/wp-content/uploads/2019/04/McFarland_Tolleson.pdf 

https://impactdm.com/project/mercedes-benz-stadium/ 

https://draperandassociates.com/project/mercedes-benz-stadium/#:~:text=Early%20in%20the%20development%20of%20the%20stadium%2C,created%20and%20maintained%20both%20individual%20time%2Dphased%20CPM 

Tarne, B. (2007). Don’t throw the baby out with the bathwater: how to combine and use both agile and traditional project management approaches. Paper presented at PMI® Global Congress 2007—North America, Atlanta, GA. Newtown Square, PA: Project Management Institute.

Post, N. (2017). The Agonies of Building Atlanta’s Mercedes-Benz Stadium. Engineering News Record.

image1.png

Share This Post

Email
WhatsApp
Facebook
Twitter
LinkedIn
Pinterest
Reddit

Order a Similar Paper and get 15% Discount on your First Order

Related Questions

Variance Analysis

  To begin your assignment, download the Financial Forecasting Template Use the EDGAR | Company Filings or Yahoo! Finance database to download the last 10-Q from Starbucks into Excel. In the Variance Analysis project, Complete the Variance Analysis Sheet on the appropriate tab in the Financial Forecasting Template, using the

BUSINESS (NO PLAGARISM A+ WORK, ON TIME)

response Response SJ (no more than 150 words) If my best friend owned a small children’s clothing store in a downtown area losing traffic to larger retailers and new strip malls, I would first recommend focusing on differentiation, community connection, and digital visibility, three areas where small businesses can compete

Mid term

Essay Assignment: Personal Impact of a Key Concept in Negotiation and Conflict Management Assignment Title: “The Concept That Changed My Perspective: A Deep Dive into Negotiation and Conflict Management” Word Count: Minimum: 1000 words Maximum: 1500 words Due Date: Submitted in Microsoft Word format and uploaded into WebCampus by October

Corporate risk

 Analyzing the impact of dividend policies on shareholder value and evaluate the use of financial derivatives to manage corporate risk.

BUSINESS (NO PLAGARISM A+ WORK, ON TIME)

Discussion – Real World example (No more than 200 words) Your best friend owns a small children’s clothing store located in the downtown area of a community of 50,000 citizens. The business has been slow the past year due to the construction of several new strip malls and a new

D7

Final Risk Management Plan: Risk Monitoring and Control Assignment Instructions Compile the previous week’s assignments for the risk management plan and submit as one document and add the Risk Monitoring and Control section. · Cover Page: Include your name, the project or company name, and the course name and number.

HTM

instructions attached It is ironic that California, as the state that provides the bulk of the nation’s fresh fruits and vegetables, has such disparity between the haves and have nots. Similarly, it’s also ironic that the hungriest Californians, also suffer from obesity and diabetes. Based on the content from this

Business

instructions and reading attached  1. Please use ChatGPT, Google or other online sources to formulate and ask a question about organizing for collective bargaining. Your question can involve anything from legal aspects, to employer anti-union campaigns etc. Why did you pick this question? What answer did you find and what

Week 8 Discussion- Marketing for Competitiveness

Persuasion and Positive Social Change In this course so far, you have begun to engage with the idea of persuasion as it applies to marketing. In the Week 5 Discussion, you reflected upon a buying experience in which you were persuaded, through marketing efforts, to make a purchase. Now think

Unit

Business Law 431 The Law of Commercial Transactions Unit 2 Assignment Please read each question carefully and draft your answers, making sure to address each part of each question. Upload your answers to the Unit 2 Assignment dropbox on Westernonline. 1 Search online to find examples of the following: a.

purpose and role that each type of financial institution in US economy

   Briefly discuss the purpose and role that each type of financial institution (depositary, contractual, and investment) play in the U.S. economy. How do each of these institutions intersect with the various types of markets, i.e., capital, money, spot (cash), derivatives, Forex and Interbank, primary, and secondary (inclusive of OTC)?

financial management (Ethics)

 Using your Wall Street Journal subscription, select an article about any publicly traded firm that enjoys a large shareholder base. How has the company incorporated ethics into the financial management practices? Discuss what challenges the firm has encountered (or is likely to encounter) and how it has sustained ethical practices

MGMT496

SEE ATTACHED Instructions Write a rationale paper describing the artifacts in the e-portfolio and how they demonstrate skills, knowledge, understanding of theory, professional disposition, real-world application, and mastery of the program objectives.  Word documents should be a minimum of 3 pages in length  not  including a cover/title page

Business Management

Working Together Competencies 304.6.3 : Working with Individuals and Groups The graduate is knowledgeable about strategies for working with individuals and groups in an organization. Introduction There are four key barriers to communication: process barriers, personal barriers, physical barriers, and semantic barriers. Requirements Your submission must represent your original work

Business Management

Managing Innovation 304.4.4 : Managing Innovation The graduate is knowledgeable about managing innovation. Introduction Organizations often try to develop an entrepreneurial culture through a strong orientation toward entrepreneurship. Requirements Your submission must represent your original work and understanding of the course material. Most performance assessment submissions are automatically scanned through

journal

need done by today Supply and Demand Curves Worksheet Data The following graph illustrates a standard supply and demand model, which shows the relationship between price and quantity in a competitive market. Complete the worksheet, using this graph as a reference. Long description: The graph illustrates a standard supply and

7-1 Discussion: Contract Law

 Find a recreation- or sport-related current event related to contract law. Discuss the court’s decision. Applying what you learned in this week’s module, do you agree/disagree with the court’s decision? Justify your answer.