Manufacturing Project (Casting-Group Project)

Description

Assessor: Date of Marking:

Grade/Mark: 25% of total grade (Group Project)

Assessment Cover Sheet

Course Title:

Comments:

Assessment Title

Programme Title:

Course Code

Group members name:

Group members ID:

Tutor:

Due Date: 07/11/2024 Date submitted:

Do not write below this line. For Polytechnic use only

Dr.Rejikumar, Mr Isa AlQubaiti, Mrs Mini Jose, Mrs DivyaRyali

By submitting this assessment for marking, either electronically or as hard copy, I confirm the following:

➢ This assignment is my own work

➢ Any information used has been properly referenced.

➢ I understand that a copy of my work may be used for moderation.

➢ I have kept a copy of this assignment

Manufacturing, Control &Environmental Sustainability

Environment &

Bachelor of Engineering Technology

Manufacturing Project (Casting-Group Project)

EN 7908

system

Transmission sytesmTransmission)

)

Manufacturing project – Group Project Report

MANUFACTURING OF A BRACKET BY METAL CASTING

(Total Marks: 25% Weightage)

Due date: 07-11-2024

Learning Outcomes:

1. Select and analyze appropriate mechanical engineering manufacturing processes for metal

components/assemblies to achieve required product specifications. Range includes casting,

forging, rolling, extrusion.

2. Design, process, evaluate and cost parameters for casting and metal forming applications

Problem Statement:

A Bracket with the following dimensions as shown in Figure 1, Table 1 and Table 2 must be

casted with the following stringent requirements.

The requirements for performance, casting production, and cost are taken into consideration.

  • Select an alloy that meets the mechanical requirements and reliably produces the castings
  • in a sound condition.

  • Select a molding method that produces the required dimensional tolerances and surface
  • finish in a cost-effective manner.

  • Develop a casting and mold design that produces flaw-free within-tolerance connectors
  • at the best cost.

    Figure 1. Dimensions of Bracket

    GROUP

    NAME A B C D E F

    GROUP 1 200 120 60 40 60 30

    GROUP 2 220 130 70 50 70 40

    GROUP 3 240 140 80 60 80 50

    GROUP 4 260 150 90 70 90 60

    GROUP 5 280 160 100 80 100 70

    All Dimensions are in “mm”

    Table: 1 Input Geometric parameters for the casting of Bracket

    Table: 2 Input materials for the casting of Bracket

    Task to be carried out with marking scheme

    S.No Tasks to be carried out Max

    Marks

    LO’S

    assessed

    1 Selection of manufacturing process with valid considerations 05 LO1

    2 Selection of material for casting with finalised mechanical

    properties

    05 LO1

    3 Product design considerations (Various allowances) 10 LO2

    4 Pouring and Gating calculations 10 LO2

    5 Riser Design and Riser Position 15 LO2

    6 Heating calculation, Selection & description of furnace for the

    desired application

    05 LO1

    7 Pouring, cleaning and Finishing operation 10 LO1

    8 Casting quality &Inspection required 10 LO1

    9 ✓ Complete three-dimensional model of the sand casting

    (showing the pattern, cavity, runner, riser, gating etc.)

    ✓ Exploded View with BOM

    ✓ Engineering drawing of the moulding showing the

    major dimensions

    30 LO2

    Total Marks: 100

    ✓ Submission: Each team leader of the GROUP should submit the project report as a pdf

    file in MOODLE (Turnitin based)

    ✓ Include the screenshot of all the solid work drawings in the report.

    ✓ Refer class notes and standards for MOLD Design

    ✓ Assume suitable data and provide justification and evidence for assumption

    ✓ Mold design files (Solid works File) should be submitted as a Zip file in Moodle

    submission

    ✓ Plagiarism policy will be strictly followed

    Detailed Marking for the Project

    Total marks: 100

    Design components Maxim

    um

    marks

    Assessment Criteria

    Selection of manufacturing

    process with valid

    considerations

    05 Selected stating all

    considerations (5)

    Selected stating some

    considerations

    (0-4)

    Selection of material with

    finalised mechanical

    properties

    05 Material selection

    justified (5)

    Material Selection not justified

    perfectly (0-4)

    Heating and Pouring

    calculations

    10 Calculations are

    correct (09-10) with

    the assumptions

    stated clearly

    Calculations are

    correct (06-08)

    with the

    assumptions not

    stated clearly

    Calculations

    are not

    correct (0-06)

    with the

    assumptions

    not stated

    clearly

    Riser Design and

    Calculations

    15 Calculations are

    correct (14-15) with

    the assumptions

    stated clearly

    Calculations are

    correct (09-13)

    with the

    assumptions not

    stated clearly

    Calculations

    are not

    correct (0-08)

    with the

    assumptions

    not stated

    clearly

    Product design

    considerations (Various

    allowances)

    10 Considered all the

    allowances in the

    design of the mold

    and reflected in the

    drawing (9-10)

    Not Considered

    all the allowances

    in the design of

    the mold but

    reflected in the

    drawing

    (07-8)

    Not

    Considered all

    the

    allowances in

    the design of

    the mold and

    not reflected

    in the

    drawing(0-6)

    Selection & description of

    furnace for the desired

    application

    05 Selection and

    description

    provided exactly

    (5)

    Selection and description not

    provided in detail (0-4)

    Pouring ,cleaning and

    Finishing operation

    10 Discussed all the

    machining

    operations

    Discussion not up

    to the mark and

    not followed

    Discussion

    not clear (0-5)

    (9-10) sequence

    (6-8)

    Casting quality 10 Casting defects and

    inspection

    discussed

    thoroughly (09-10)

    Casting defects

    and inspection

    discussed but not

    in detailed

    manner

    (06-08)

    More scope

    for

    improvement

    (0-05)

    Model and Engineering

    drawing

    30 Drawing up to the

    standard and

    reveals all the

    information (28-30)

    Drawing not to

    the standard and

    with missing

    information (15-

    27)

    Drawing is

    not to the

    standard and

    provided with

    less

    information

    (0-14)

    Assessment Cover Sheet

    Assessment Title

    Programme Title:

    Manufacturing Project (Casting-Group Project)

    Bachelor of Engineering Technology
    EN 7908

    Course Code

    Course Title:

    Manufacturing, Control &Environmental Sustainability

    system

    Environment &
    Group members name:

    Group members ID:

    Transmission sytesmTransmission)
    )

    Dr.Rejikumar, Mr Isa AlQubaiti, Mrs Mini Jose, Mrs DivyaRyali

    Tutor:

    Due Date: 07/11/2024

    Date submitted:

    By submitting this assessment for marking, either electronically or as hard copy, I confirm the following:



    This assignment is my own work
    Any information used has been properly referenced.
    I understand that a copy of my work may be used for moderation.
    I have kept a copy of this assignment

    Do not write below this line. For Polytechnic use only

    Assessor:
    Grade/Mark: 25% of total grade (Group Project)

    Comments:

    Date of Marking:

    Manufacturing project – Group Project Report
    MANUFACTURING OF A BRACKET BY METAL CASTING
    (Total Marks: 25% Weightage)
    Due date: 07-11-2024
    Learning Outcomes:
    1. Select and analyze appropriate mechanical engineering manufacturing processes for metal
    components/assemblies to achieve required product specifications. Range includes casting,
    forging, rolling, extrusion.
    2. Design, process, evaluate and cost parameters for casting and metal forming applications

    Problem Statement:
    A Bracket with the following dimensions as shown in Figure 1, Table 1 and Table 2 must be
    casted with the following stringent requirements.
    The requirements for performance, casting production, and cost are taken into consideration.

    Select an alloy that meets the mechanical requirements and reliably produces the castings
    in a sound condition.

    Select a molding method that produces the required dimensional tolerances and surface
    finish in a cost-effective manner.

    Develop a casting and mold design that produces flaw-free within-tolerance connectors
    at the best cost.

    Figure 1. Dimensions of Bracket
    GROUP
    NAME

    A

    B

    C

    D

    E

    F

    GROUP 1

    200

    120

    60

    40

    60

    30

    GROUP 2

    220

    130

    70

    50

    70

    40

    GROUP 3

    240

    140

    80

    60

    80

    50

    GROUP 4

    260

    150

    90

    70

    90

    60

    GROUP 5

    280

    160

    100

    80

    100

    70

    All Dimensions are in “mm”
    Table: 1 Input Geometric parameters for the casting of Bracket

    Table: 2 Input materials for the casting of Bracket

    Task to be carried out with marking scheme

    S.No

    Tasks to be carried out

    Max
    Marks
    05

    LO’S
    assessed
    LO1

    1

    Selection of manufacturing process with valid considerations

    2

    05

    LO1

    3

    Selection of material for casting with finalised mechanical
    properties
    Product design considerations (Various allowances)

    10

    LO2

    4

    Pouring and Gating calculations

    10

    LO2

    5

    Riser Design and Riser Position

    15

    LO2

    6

    05

    LO1

    7

    Heating calculation, Selection & description of furnace for the
    desired application
    Pouring, cleaning and Finishing operation

    10

    LO1

    8

    Casting quality &Inspection required

    10

    LO1

    ✓ Complete three-dimensional model of the sand casting
    (showing the pattern, cavity, runner, riser, gating etc.)
    ✓ Exploded View with BOM
    ✓ Engineering drawing of the moulding showing the
    major dimensions

    30

    LO2

    Total Marks:

    100

    9

    ✓ Submission: Each team leader of the GROUP should submit the project report as a pdf
    file in MOODLE (Turnitin based)
    ✓ Include the screenshot of all the solid work drawings in the report.
    ✓ Refer class notes and standards for MOLD Design
    ✓ Assume suitable data and provide justification and evidence for assumption
    ✓ Mold design files (Solid works File) should be submitted as a Zip file in Moodle
    submission
    ✓ Plagiarism policy will be strictly followed

    Detailed Marking for the Project

    Total marks: 100
    Design components

    Maxim
    um
    marks

    Selection of manufacturing
    process with valid
    considerations
    Selection of material with
    finalised mechanical
    properties
    Heating and Pouring
    calculations

    05

    Selected stating all
    considerations (5)

    05

    Material selection
    justified (5)

    10

    Calculations are
    correct (09-10) with
    the assumptions
    stated clearly

    Calculations are
    correct (06-08)
    with the
    assumptions not
    stated clearly

    Discussed all the
    machining
    operations

    Discussion not up
    to the mark and
    not followed

    Riser Design and
    Calculations

    15

    Product design
    considerations (Various
    allowances)

    10

    Selection & description of
    furnace for the desired
    application

    05

    Pouring ,cleaning and
    Finishing operation

    10

    Assessment Criteria

    Selected stating some
    considerations
    (0-4)
    Material Selection not justified
    perfectly (0-4)

    Calculations
    are not
    correct (0-06)
    with the
    assumptions
    not stated
    clearly
    Calculations are
    Calculations are
    Calculations
    correct (14-15) with correct (09-13)
    are not
    the assumptions
    with the
    correct (0-08)
    stated clearly
    assumptions not
    with the
    stated clearly
    assumptions
    not stated
    clearly
    Considered all the
    Not Considered
    Not
    allowances in the
    all the allowances Considered all
    design of the mold
    in the design of
    the
    and reflected in the the mold but
    allowances in
    drawing (9-10)
    reflected in the
    the design of
    drawing
    the mold and
    (07-8)
    not reflected
    in the
    drawing(0-6)
    Selection and
    Selection and description not
    description
    provided in detail (0-4)
    provided exactly
    (5)
    Discussion
    not clear (0-5)

    (9-10)
    Casting quality

    10

    Casting defects and
    inspection
    discussed
    thoroughly (09-10)

    Model and Engineering
    drawing

    30

    Drawing up to the
    standard and
    reveals all the
    information (28-30)

    sequence
    (6-8)
    Casting defects
    and inspection
    discussed but not
    in detailed
    manner
    (06-08)
    Drawing not to
    the standard and
    with missing
    information (1527)

    More scope
    for
    improvement
    (0-05)

    Drawing is
    not to the
    standard and
    provided with
    less
    information
    (0-14)

    Purchase answer to see full
    attachment

    Share This Post

    Email
    WhatsApp
    Facebook
    Twitter
    LinkedIn
    Pinterest
    Reddit

    Order a Similar Paper and get 15% Discount on your First Order

    Related Questions

    121 ass 1

    Description see College of Health Sciences Department of Public Health ASSIGNMENT COVER SHEET Course name: INTRODUCTION TO BIOSTATISTICS Course number: PHC 121 XXXXX(required) CRN Week 10: Paper Assignment Answer the following questions: Assignment title or task: (You can write a question) 1. What is the purpose of writing down and

    121 ass 2

    Description see College of Health Sciences Department of Public Health ASSIGNMENT COVER SHEET Course name: INTRODUCTION TO BIOSTATISTICS Course number: PHC 121 XXXXX(required) CRN Week 10: Paper Assignment Answer the following questions: Assignment title or task: (You can write a question) 1. What is the purpose of writing down and

    121 ass 3

    Description see College of Health Sciences Department of Public Health ASSIGNMENT COVER SHEET Course name: INTRODUCTION TO BIOSTATISTICS Course number: PHC 121 XXXXX(required) CRN Week 10: Paper Assignment Answer the following questions: Assignment title or task: (You can write a question) 1. What is the purpose of writing down and

    121 ass 4

    Description see College of Health Sciences Department of Public Health ASSIGNMENT COVER SHEET Course name: INTRODUCTION TO BIOSTATISTICS Course number: PHC 121 XXXXX(required) CRN Week 10: Paper Assignment Answer the following questions: Assignment title or task: (You can write a question) 1. What is the purpose of writing down and

    121 ass 5

    Description see College of Health Sciences Department of Public Health ASSIGNMENT COVER SHEET Course name: INTRODUCTION TO BIOSTATISTICS Course number: PHC 121 XXXXX(required) CRN Week 10: Paper Assignment Answer the following questions: Assignment title or task: (You can write a question) 1. What is the purpose of writing down and

    Ct.

    Description Module 9: Critical Thinking Assignment 2 file For this assignment, you will analyze the quality management practices and location decisions of a prominent organization in Saudi Arabia. Your chosen organization should have a significant presence in the country and operate in a sector important to the Saudi Arabian economy.

    Business Question

    Description * The Assignment must be submitted on Blackboard (WORD format only) via allocated folder. * Assignments submitted through email will not be accepted. * Students are advised to make their work clear and well presented, marks may be reduced for poor presentation. This includes filling your information on the

    Business Question

    Description * This assignment is an individual assignment. * The Assignment must be submitted on BB only in WORD format via allocated folder. * Assignments submitted through email will not be accepted. * Students are advised to make their work clear and well presented; marks may be reduced for poor

    law of electronic commerce LAW402

    Description ACTION ITEMS An e-mail is sent to Party B, in order to form a contract. Party A is the sender of the email. Party A’s identification is located at the top of the e-mail and is sufficient to show authentication. Will use of the individual’s initials or name at

    Business Question

    Description * The Assignment must be submitted on Blackboard (WORD format only) via allocated folder. * Assignments submitted through email will not be accepted. * Students are advised to make their work clear and well presented, marks may be reduced for poor presentation. This includes filling your information on the

    Business Question

    Description * The Assignment must be submitted on Blackboard (WORD format only) via allocated folder. * Assignments submitted through email will not be accepted. * Students are advised to make their work clear and well presented; marks may be reduced for poor presentation. This includes filling your information on the

    Management Question

    Description Please support your answers with examples and clear explanation. •Avoid originality, similarity and plagiarism, Do not copy or quote from any sources and you must paraphrase. •Each question must be answered between 250 to 300 words. • All references must be cited using APA format. •All answered must be

    Management Question

    Description ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment 2 Communications Management (MGT 421) Due Date: 2/11/2024 @ 23:59 Course Name: Communication Management Student’s Name: Course Code: MGT421 Student’s ID Number: Semester: 1st

    Management Question

    Description ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment 2 Strategic Management (MGT 401) Due Date: 02/11/2024 @ 23:59 Course Name: Strategic Management Student’s Name: Course Code: MGT 401 Student’s ID Number: Semester:

    Management Question

    Description ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment 2 Project Management (MGT 323) Due Date: 02/11/2024 @ 23:59 Course Name: Project Management Student’s Name: Course Code: MGT323 Student’s ID Number: Semester: First

    Management Question

    Description ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment 2 MGT324 (1st Term 2024-2025) Deadline: 02/11/2024 @ 23:59 (To be released to students on BB in Week 7) Course Name: Public Management Course

    Management Question

    Description ‫المملكة العربية السعودية‬ ‫وزارة التعليم‬ ‫الجامعة السعودية اإللكترونية‬ Kingdom of Saudi Arabia Ministry of Education Saudi Electronic University College of Administrative and Financial Sciences Assignment 2 Quality Management (MGT 424) Due Date: 02/11/2024 @ 23:59 Course Name: Quality Management Student’s Name: Course Code: MGT 424 Student’s ID Number: Semester: