Our Services

Get 15% Discount on your First Order

[rank_math_breadcrumb]

BCN3611 Term Project

Unsure of how to approach this and analyze plans. 

DEPT. OF CONSTRUCTION MANAGEMENT
BCN 3611 – CONST. COST ESTIMATING I

FALL 2019

TERM PROJECT ASSIGNMENT DESCRIPTION
One-Story Single Family House (MAKU Residence)

OBJECTIVE AND GENERAL REQUIREMENTS

The objective of the term project assignment is to prepare a Bid Proposal for constructing a one-story single
family house (MAKU Residence). Students must approach the assignment from the perspective of a
construction contractor attending a bid, and prepare a professional price proposal using their knowledge,
skills and common sense. This requires proper efforts with regards to:

• Reading and understanding plans;
• Recognizing construction work items;
• Surveying the quantity for various types of work;
• Using cost databases to acquire cost of construction efforts;
• Estimating indirect and total cost of construction; and
• Submitting and presenting a professional proposal of their cost estimation.

General requirements of the proposal are as following:

• This is an individual assignment and students will not be allowed to work in groups.
• Use the project plans and other reference material posted on Canvas to identify the scope of work

in this project and complete the quantity take-off.
• Follow the CSI MasterFormat® (2004 Edition) in organizing the cost estimate proposal.
• Use the R.S. Means Online website ( to get cost data for all

identified work items. It is the students’ responsibility to follow up on the invitation email to setup
an account on the R.S. Means Online website and to inform the instructor immediately if they have
not received such email (double check your email spam folder).

• In case of any missing or incomplete information, students can make reasonable and justifiable
assumptions. All assumptions must be clearly listed in the proper sections of the proposal, as
described later in this document.

MINIMUM SCOPE

This section describes the minimum scope of work required in this project. This includes items from the
following 11 CSI MasterFormat® divisions:

Division 01: General Conditions and Requirements
• Identify all general requirement items that should apply to this job, assuming 12 month duration

for entire construction. Students are encouraged to make reasonable and justifiable assumptions
based on common sense and regular construction practices to cover any missing information.

Division 03: Concrete (for Slab, Footings, and Foundations)
• Concrete forming and reinforcing steel, including required accessories (use separate cost items)
• Concrete placement (including curing and finishing, wherever applicable)

Division 04: Masonry
• Masonry units and accessories (including mortar and grout, if needed)
• Bond Beams

Engineering
& Computing

FLORIDA INTERNATIONAL UNIVERSITY

Term Project Assignment 09/11/2019 Page 1| 3

Mahya Sam

Mahya Sam

Engineering DEPT- OF c o n s t r u c t i o n m a n a g e m e n t
& Computing BCN 3611 – c o n s t , c o s t e s t i m a t i n g i

FALL 2019FLORIDA INTERNATIONAL UNIVERSITY

Division 05: Metals
• Wall studs

Division 06: Wood
• Roof framing structure (prefabricated truss system) and sheathing
• Others

Division 07: Thermal and Moisture Protection
• Below-grade moisture protection (primer, vapor barrier, protection board, coving material, etc.)
• Walls (interior and exterior) and ceiling thermal insulation. Use R-l 1 insulation for interior walls.
• Roof Tiles and accessories

Division 08: Openings
• Doors and Windows

Division 09: Finishes
• All wall, flooring and ceiling finishes

Division 11: Equipment
• Residential appliances such as kitchen equipment, washers and dryers, etc.

Division 31: Earthwork
• Structural excavation and backfill (with compaction) – assume 2 feet of working space on all sides

and excavation slope of I : I.

Division 32: Exterior Improvements
• Fencing, sidewalks and driveways …etc.

PROJECT REPORT

The final report must be submitted as a single PDF file organized in the following sections:

• Cover Sheet: Your information and title of the report.
• Proposal Summary Sheets: summary table of cost estimates in both CSI MasterFormat and AST

Uniformat II. (see spreadsheet templates posted on Canvas).
• Separate section for each CSI division, consisting of:

o Summary sheet including cost items identified for the division. The description of each item
should be clear and written to describe the work item not the description of the RS Means item
used for pricing (see cover table template on Canvas),

o Estimated cost of items and divisions, included in the above summary table,
o List of all the assumptions made in order to complete the quantity takeoffs, and
o Typed takeoff calculations of all quantities included in the estimate or a scanned copy of neatly

written and properly-organized handwritten takeoff calculations. You should:
■ Keep calculations neat and clear.
■ Separate calculations of different items using lines and titles.
■ Mention name of methods that you used in calculations (if applicable).
■ Show proper and adequate comments for your calculations.

In addition to the PDF file, the Microsoft Excel file used to develop the cost summary sheets
mentioned above should also be submitted.

Term Project Assignment 09/11/2019 Page 2| 3

Mahya Sam

Mahya Sam

DEPT. OF CONSTRUCTION MANAGEMENT
BCN 3611 – CONST. COST ESTIMATING I

FALL 2019

EVALUATION CRITERIA

Submissions will be evaluated using the following rubric

Organization and Presentation 15

Division 1 – General Requirements 10

Division 3 – Concrete 10

Division 4 – Masonry 10

Division 5 – Metals 5

Division 6 – Wood 10

Division 7 – Thermal and Moisture Protection 5

Division 8 – Openings 5

Division 9 – Finishes 10

Division 10 – Equipment 5

Division 31 – Earthwork 10

Division 32 – Exterior Improvements 5

Total 100

The grade for the 11 divisions will be based on:

• The comprehensiveness of the estimate (i.e. including all the applicable items that need to be estimated)
• The accuracy of the quantity take-off
• The appropriateness of the cost items selected from RS Means

Engineering
& Computing

FLORIDA INTERNATIONAL UNIVERSITY

Term Project Assignment 09/11/2019 Page 31 3

Mahya Sam

Mahya Sam

Share This Post

Email
WhatsApp
Facebook
Twitter
LinkedIn
Pinterest
Reddit

Order a Similar Paper and get 15% Discount on your First Order

Related Questions

Project2- Write and Submit the Final Cloud Deployment Architecture Plan

Project 2: Design the Cloud Deployment Architecture  Step 10: Write and Submit the Final Cloud Deployment Architecture Plan  In this step, you will create and submit your consolidated Cloud Deployment Architecture Plan for email, software development, and backups and archiving. The Cloud Deployment Architecture plan, which should be between eight

Engineering Manufacturing Question

Check Uploaded Files for Instructions ● Written at a 3rd year college essay level (USE SPELL CHECK/ GRAMMAR CHECK) ● Minimum 2 pages long, singled spaced or 4 pages long, double spaced

Avoid these mistakes while handling hydraulics

   It is not a simple task to handle systems like hydraulics and Hydraulic Hose Fittings. Proper care is required for them. Given below are certain mistakes that are supposed to be avoided to ensure proper working.  1. Follow manufacturer’s recommendations: It is important to follow the manufacturer’s recommendations for

Maku residence Estimation project

I have to make a full project estimation off of the plans using rsmeans for costs of materials and fill out excel sheets. more details will be in the files below.

HELP ENGLISH

MLA FORMAT NO AI DETECTION NO PLAGARISM Essay 1: Theme Analysis Essay   Previous  Next  Instructions Prepare First, choose which two works you’ll be focusing on for this essay.  · You can choose two short stories, two poems, or one of each · It is recommended (though not required) that

Construction and safety

Please see the attached files  OSH 324 – Construction Safety Management 80 points Project – Due Thursday, April 13, 2022 Purpose: Address Safety hazards for Bid document Expected outcome: The student will gain a basic comprehension of hazards associated with a specific job, evaluate the hazards, research solutions and state

Work, Energy, Power, and Momentum

 Show the process of solving each problem. The answer is already provided.    Chapter 14:  Work, Energy, and Power · Section: Problems · 14-56 A gear with a mass moment of inertia of 0.45 kg⋅m2 has a kinetic energy of rotation of 21 joules. What is its speed of rotation in

Plane Motion

 Show the process of solving each problem. The answer is already provided.  Plane Motion If a rigid body moves with both translational and rotational motion, it is said to be in general plane motion. To analyze general plane motion, equations describing the translation of the center of gravity and the

Engineering – Electronic Engineering Assignment Kinetics

  Show the process of solving each problem. The answer is already provided.   Review Assignment Kinetics Kinetics, the study of unbalanced forces causing motion, can be analyzed by three methods: inertia force or torque (dynamic equilibrium), work and energy, and impulse and momentum. Consider the following as you complete your assignment:

Engineering – Electronic Engineering Review Assignment Angular Motion

 Show the process of solving each problem. The answer is already provided.  · Chapter 11 Kinematics: Angular Motion · Pay careful attention to sign convention of both given data and calculated values. If initial velocity or displacement is positive, then acceleration is positive and deceleration is negative. · For a

issue3

This is the third writing assignment. Each student shall write 3-5 pages on the topic of professional practice issues including tables, figures, references, etc. The assignment should be in times new roman, 12- point font, and double-spaced. This is an individual assignment, so each student does the work alone. Note:

write 3

see file This is the third writing assignment. Each student shall write 3-5 pages on the topic of professional practice issues including tables, figures, references, etc. The assignment should be in times new roman, 12- point font, and double-spaced. This is an individual assignment, so each student does the work

Kinematics: Rectilinear Motion

Show the process of solving each problem. The answer is already provided. Kinematics: Rectilinear Motion   Rectilinear motion problems deal with an object that moves laterally, or horizontally and does not rotate about its center of mass. Watch the following video to see an another problem example · Section: Problems  ·

www

watch the videos on process safety and discuss the following questions. The Danger of Popcorn Polymer: Incident at the TPC Group Chemical Plant runaway-explosion-at-t2-laboratories/ 1. What are some of the potential hazards associated with the given examples? 2. Explain Runaway reactions- Give an example of a thermal runaway reaction 3.

vibration

The suspension system of a car traveling on a bumpy road has a stiffness of and the effective mass of the car on the suspension is m=750kg. The road bumps can be considered to be periodic half- sine waves as indicated in Figure. Determine the displacement response of the car.

Project Proposal on the History and Future of Technology

 Brainstorm three potential project topics,  Focus on the transition into the 21st century.  Propose a project highlighting these fields’ evolution into the 21st century, focusing on recent innovations, current challenges, and future trends.  See Instructions below