Our Services

Get 15% Discount on your First Order

[rank_math_breadcrumb]

Confidence intervals and sample size

 

Instructions: You must respond to at least 2 other students. Responses may include direct questions.

In your first peer posts, pick another confidence level, i.e. 90%, 99%, 97%, any other confidence level is fine.  Have fun and be creative with it and calculate another T-confidence interval and interpret your results.  Compare your results to that of the initial 95%, how much do they differ?  How useful can this type of information be when you go to buy a new car, or even a house?  

In your second peer posts, pick another confidence level, i.e. 90%, 99%, 97%, any other confidence level is fine.  Have fun and be creative with it and calculate another proportion interval and interpret your results.  Compare your results to that of the initial 95%, how much do they differ?  How useful can this type of information be when you go to buy a new car, or even a house?  

Make sure you include your data set in your initial post as well studen1  ruocco

Confidence intervals and sample size

Initial Confidence Intervals

From the provided data (excluding the supercar outlier), we have been given the mean, standard deviation, and sample size as follows;

Mean (µ) = 25014

Standard deviation (σ) = 88.47

Sample Size (n) = 10

We will first calculate the two T-confidence intervals at 95% from the given values. One interval will be a T-confidence interval for the sample mean, and the other will be a proportion confidence interval for the proportion of cars below the average price.

T-Confidence Interval at 95%

Calculating the T-confidence interval at 95% involves first calculating the T-critical value, then calculating the standard error (SE), calculating the Margin of Error (ME), and finally calculating the Confidence Interval.

Calculate the T-Critical Value

Confidence Level = 95%

Alpha (α) = 0.05

Degrees of Freedom (DF) = n – 1 = 10 – 1 = 9

T-Critical Value (T*) using Excel: =T.INV(0.975, 9)

Calculate the Standard Error (SE)

SE if calculated by taking Standard deviation divided by the square root of the sample size;

????????=3488.4710 divided by the square root of 10=1103.60

Calculate the Margin of Error (ME)

In calculating the ME, we consider the product of T-critical value (T) and the SE. Here, the T-critical value is 2.262, obtained from statistical tables o, and the Standard Error, calculated earlier, is 1103.60. The multiplication then gives us ME to be 2495.50 as shown;

????????=????*×????????=2.262×1103.60=2495.50

Calculate the Confidence Interval (CI)

Therefore, to calculate CI, we start with the mean, which represents the average value of our data set, in this case,014. The ME is determined by how much uncertainty there is in the estimate (Chang et al.), which, in this case, is calculated to be 495.50. We calculate the lower and upper bounds to find the range of true values.

The lower bound = ME minus mean= 518.50.

The upper bound = ME added to the mean= 509.50.

We are 95% confident that the actual mean price of the cars in the sample population lies between 518.50 and 509.50. This means that if we were to take many samples and calculate a confidence interval for each, approximately 95% of those intervals would contain the accurate mean price of the cars.: Confidence intervals and sample size

Proportion Confidence Interval at 95%

In calculating the potential confidence interval, we first calculate the p and q, then find the critical value, which is used to find the SE and ME.

Calculations

Calculate p and q

Number of cars below the average price: 4 (assuming p = 0.4)

????​=0.4

Therefore, ????=1−????=1−0.4=0.6

Calculate the Z-Critical Value

Confidence Level = 95%

Alpha (α) = 0.05

 For a 95% confidence level, we seek the Z* value corresponding to the cumulative probability of 0.975. We utilize the NORM.S.INV function in Excel, inputting the desired cumulative probability (0.975) to obtain the Z-critical value. 

Calculate the Standard Error (SE)

Calculating the SE involves first finding the multiplication of p and q values and then dividing the product by a number of intervals (Riley et al.). We then finally find the square root of the final value. 0.4 *0.6, then divide by 10 t to give 0.024. Its square root then gives us 0.1549

Calculate the Margin of Error (ME)

 The Margin Error is calculated by  taking the value of Z and multiplying it with SE value to give 0.3036

????????=1.96×0.1549=0.3036

Calculate the Confidence Interval

            The confidence interval is calculated by taking the p values, adding them to ME, and then negating the same value from ME.

????????=????±????????=0.4±0.3036C to find

???????????????????? ????????????????????=0.4−0.3036=0.0964

???????????????????? ????????????????????=0.4+0.3036=0.7036

Therefore  95% of cars are below the average price of between 9.64% and 70.36% hence imply that if we were to take many samples and calculate a confidence interval for each, approximately 95% of those intervals would have the proper proportion of cars below the average price.

Response 1: T-Confidence Interval at 90%

Calculate the T-Critical Value for 90%:

Confidence = 90%

 (α) = 0.10

 (DF) = 9

T-Critical Value (T*) using Excel: =T.INV(0.95, 9)

Calculate the new Margin of Error (ME):

????????=????*×????????=1.833×1103.60=2024.09

Calculate the new Confidence Interval:

????????=????±????????=25014±2024.09

???????????????????? ????????????????????=25014−2024.09=22989.91

????????????????????=25014+2024.09=27038.09

The result gives a 90% confident that exact mean price of the cars lies between $22,989.91 and $27,038.09. This narrower interval suggests we are less confident than the 95% confidence level. However, we still expect the true mean to fall within this range with high confidence.

student 2 

For the first interval you need to calculate a T-confidence interval for the sample population.

T confidence interval is the probability =CONFIDENCE.T(alpha, standard_dev, size 

My Mean was 176589

SD: 355498

95% T-CONFIDENCE

When I plug in the formula, =confindence.t (1,355498,13) I get a NUM# error. Once I tried it again, I got 165492.8783,518672.6965]  I am not sure what I did wrong the first time but im happy I at least got some type of number. 

Confidence Interval=176589.9091±(1.96×13​355498.348​)

PT2: 

Proportion=Total Sample SizeNumber of cars below average​

Proportion=Number of cars below average13Proportion=13Number of cars below average​

=0.191998,0.730002 

Proportion=0.461 total Sample Size=13

Shedrece

Share This Post

Email
WhatsApp
Facebook
Twitter
LinkedIn
Pinterest
Reddit

Order a Similar Paper and get 15% Discount on your First Order

Related Questions

Math Unit VII

See attached Unit VII Journal Watch  Video 4: Embracing Challenges . Reflect on your time in this course. What challenges have you faced? What strategies or mindsets did you implement to overcome these challenges? How could you improve your strategy and mindset so that they are more effective? Your journal

What is Methodology

How do I identify specific mixed-methods designs (e.g., convergent parallel, explanatory sequential) and how do I make clear the sequence and Priority of qualitative vs. quantitative strands. Which one should I do first and second? How can I integrate the two?  How do i fully explain the justification for secondary data analysis?

Discussion Activity 3

  Understanding the intricacies of data interpretation is crucial in social work practice, as it informs decision-making and helps guide interventions that impact individuals and communities. Two important concepts in this regard are standard errors and statistical significance. These concepts help social workers assess the reliability of data and the

Cardiac Rhythm Interpretation Education Poster Project

Cardiac Rhythm Interpretation Education Poster Project Due: Sat Feb 21, 2026 11:59am Ungraded, 50 Possible Points50 Points Possible Attempt In Progress Cardiac Rhythm Interpretation Education Poster Project  For this project, you will create a professional, patient-safety-focused educational poster on a selected cardiac rhythm or cardiac emergency. The poster must demonstrate your understanding of

Mathematics Homework

  Use the information needed for week 6 and answer the questions 1 Create a pie chart for the variable insurance in excel:  · Review this video to learn how to create a pie chart in excel.Links to an external site.     · First, you have to create a frequency

Excel

 What is Excel to you, and how do you use it? Is this software important in today’s business environment? 

ma

Handout #4 Math 101 Name: _____________________________ Basic Probability & Odds Two dice are rolled. Use the table from our notes to identify the sample space. Then calculate the probability of each event. 1. What is the probability that we roll a sum less than 8? 2. What is the probability

MAT DB V

See attached Unit V Discussion Board Watch  Video 3: The Power of “Yet,”  and evaluate your course progress. Are you meeting your goals for the course? What goals do you have for the remainder of the class? What strategy can you implement to help you achieve those goals? Next, respond

MAT IV JL

See Attached Watch the  video  The Power of Making Mistakes . Describe a situation where you made a mistake in this course. How can you learn from your mistake in order to better understand the course material? What did this mistake teach you? If this was another person describing their

home work

Competency Evaluate hypothesis tests for population parameters from two populations. Project Deliverable tie to Competency  In your fifth assignment, you will continue applying hypothesis testing methods to real-world situations. This assignment will require you to expand your understanding of situations that involve comparing two populations, which is a critical skill

home work

Competency Evaluate hypothesis tests for population parameters from one population. Project Deliverable tie to Competency  In the fourth assignment, you will need to make data-driven decisions by evaluating claims about a single population. You will be tasked with completing several hypothesis tests, which follow a structured process: stating hypotheses, selecting

it is a MATHEMATICS QUESTION

  Three resistors of 2 Ω, 3 Ω and 6 Ω are connected in parallel. This combination is connected in series with a 4 Ω resistor. The whole circuit is connected to a 12 V battery. Find: Total resistance of the circuit   Total current from the battery   Current

home work

Competency Develop a confidence interval for a population parameter. Project Deliverable tie to Competency  In the third assignment, you will construct and interpret confidence intervals, which is a fundamental concept in inferential statistics. By estimating population parameters such as the mean and proportion using sample data, you will gain a

Math

Which inequality is equivalent to –m ≥ 15? CLEAR CHECK m ≥ 15 m ≥ -15 m ≤ -15 m ≤ 15

Home work

Competency Apply the normal distribution, standard normal distribution, and central limit theorem. Project Deliverable tie to Competency  In module 02, you will summarize graphical and numerical methods to represent quantitative data. This includes utilizing the central limit theorem to calculate probabilities for real-world problems. It will also require you to

math 210 wk 9 i need healp

MAT210 – Week 9 Assignment Template Week 9 Assignment Template Making Data Driven Decisions Name:  Case Study:    1. Construct a box-and-whisker plot in Excel for the data set you used in your ALEKS assignment for this week. Paste that below. 1. Evaluate the results of the hypothesis test and

VII Math

See Attached Unit VII Math Journal Throughout this course, you have had access to unit study guides, reference sheets, note-taking guides, instructional videos, and learning aides. Reflect on how you used these resources to help you complete each assignment thus far, and describe how you can use these resources to