Description
– I want original text, no plagiarism.
– You can find the instructions in the file. Please read it carefully.
– APA Style.
– Please use the same cover page file to include the solutions.
Thanks
–
Textbook:
Stevenson, W. (2021). Operations management (14th ed.). New York, NY: McGraw-Hill Irwin
the professor requested that.
Project Management
Critically analyze the role of project management in the successful delivery of a
complex, high-stakes project. In your analysis, be sure to address the following key
points:
1. How do leadership styles, team dynamics, and stakeholder management
impact project outcomes? Provide examples of how emotional intelligence and
conflict resolution skills are critical for project managers.
2. Discuss the risks and challenges of deviating from established project
management methodologies. Analyze a case study where a project failed due
to skipping or rushing through key project phases.
3. Evaluate the project manager’s responsibility for identifying, assessing, and
mitigating risks. Provide an example of how proactive risk management
enabled a project to overcome major obstacles.
4. Compare the strengths and weaknesses of traditional waterfall models vs
agile/iterative approaches. Analyze which model is most appropriate for
different types of projects and organizational contexts.
Directions:
•
Your assignment is required to be four to five pages in length, which does not
include the title page and reference pages, which are never a part of the
content minimum requirements.
•
Support your submission with course material concepts, principles, and
theories from the textbook and at least three scholarly, peer-reviewed journal
articles. Use the Saudi Digital Library to find your resources.
•
Formatted according to APA 7th edition and Saudi Electronic University
writing standards.
•
Review the grading rubric to see how you will be graded for this assignment.
Textbook:
Stevenson, W. (2021). Operations management (14th ed.). New York, NY: McGraw-Hill
Irwin.
Operation Management
MGT530-XXXX
Operation Management
Critical Thinking. Project Management. Module 13
100 pts
Student ID: XXXXX
Name
XX/12/2025
1
Name
CT_Rubric_100
Description
100 Points
Rubric Detail
Levels of Achievement
Criteria
Exceeds Expectation
Meets Expectation
Some Expectations
Unsatisfactory
Content
33 to 35 points
29 to 32 points
26 to 28 points
0 to 25 points
Demonstrates
substantial and
extensive knowledge of
the materials, with no
errors or major
omissions.
Demonstrates adequate
knowledge of the
materials; may include
some minor errors or
omissions.
Demonstrates fair
knowledge of the materials
and/or includes some
major errors or omissions.
Fails to demonstrate
knowledge of the
materials and/or
includes many major
errors or omissions.
33 to 35 points
29 to 32 points
26 to 28 points
0 to 25 points
Provides strong thought,
insight, and analysis of
concepts and
applications.
Provides adequate
thought, insight, and
analysis of concepts and
applications.
Provides poor though,
insight, and analysis of
concepts and applications.
Provides little or no
thought, insight, and
analysis of concepts and
applications.
15 to 15 points
13 to 14 points
11 to 12 points
0 to 10 points
Sources go above and
beyond required criteria
and are well chosen to
provide effective
substance and
perspectives on the
issue under
examination.
Sources meet required
criteria and are
adequately chosen to
provide substance and
perspectives on the issue
under examination.
Sources meet required
criteria but are poorly
chosen to provide
substance and perspectives
on the issue under
examination.
Source selection and
integration of knowledge
from the course is clearly
deficient.
15 to 15 points
13 to 14 points
11 to 12 points
0 to 10 points
Project is clearly
organized, well written,
and in proper format as
outlined in the
assignment. Strong
sentence and paragraph
structure, contains no
errors in grammar,
spelling, APA style, or
APA citations and
references.
Project is fairly well
organized and written
and is in proper format as
outlined in the
assignment. Reasonably
good sentence and
paragraph structure, may
include a few minor
errors in grammar,
spelling, APA style, or APA
citations and references.
Project is poorly organized
and written and may not
follow proper format as
outlined in the assignment.
Inconsistent to inadequate
sentence and paragraph
development, and/or
includes numerous or
major errors in grammar,
spelling, APA style or APA
citations and references.
Project is not organized
or well written and is not
in proper format as
outlined in the
assignment. Poor quality
work; unacceptable in
terms of grammar,
spelling, APA style, and
APA citations and
references.
Analysis
Sources
Demonstrates
college-level
proficiency in
organization,
grammar and
style.
View Associated Items
Print
Close Window
Purchase answer to see full
attachment