Description
Module 11: Lean Operations and Scheduling
Discussion Question
Question Requirements:
Lean operations have become a widely adopted approach in modern operations management, promising increased efficiency, reduced waste, and improved quality. You are tasked with discussing the effectiveness of lean operations in achieving these goals.
- Discuss the strengths and limitations of lean operations in different industries or organizational contexts and the potential trade-offs or conflicts that may arise between lean principles and other operational priorities.
- Discuss the challenges and best practices in sustaining a culture of continuous quality improvement within a lean operations environment.
Directions:
- Discuss the concepts, principles, and theories from your textbook. Cite your textbooks and cite any other sources.
- Write a discussion that includes an introduction paragraph, the body, and a conclusion paragraph to address the assignment’s guide questions.
- Your initial post should address all components of the question with a 600-word limit.
Learning Outcomes
- Evaluate the effectiveness of lean operations in operations management.
- Evaluate the principles of lean operations.
- Analyze how lean methods improve quality.
Readings
Required:
- Chapter 14 & Supplement to Chapter 14 in Operations Management
- Chapter 14 & Supplement to Chapter 14 PowerPoint Presentations
- Balinado, J.R.O., & Prasetyo, Y.T. (2020).The impact of 5s lean tool to service operation: A case study in Toyota Dasmarinas-Cavite service operations. ICIBE, 185-190.
Recommended:
- Carranza Inga, I., Villayzan Palomino, E., Altamirano, E., & del Carpio, C. (2021). Improvement model based on four lean manufacturing techniques to increase productivity in metalworking company. IEIM, 95-99.
- Kęsek, M., Bogacz, P., & Migza, M. (2023). Study on the Usefulness of Lean Management Tools and Techniques in Coal Mines in Poland. Energies (19961073), 16(21), 7240.
Discussion Question
Question Requirements:
Lean operations have become a widely adopted approach in modern operations management,
promising increased efficiency, reduced waste, and improved quality. You are tasked with discussing
the effectiveness of lean operations in achieving these goals.
•
Discuss the strengths and limitations of lean operations in different industries or
organizational contexts and the potential trade-offs or conflicts that may arise between lean
principles and other operational priorities.
•
Discuss the challenges and best practices in sustaining a culture of continuous quality
improvement within a lean operations environment.
Directions:
• Discuss the concepts, principles, and theories from your textbook. Cite your textbooks and
cite any other sources.
• Write a discussion that includes an introduction paragraph, the body, and a conclusion
paragraph to address the assignment’s guide questions.
• Your initial post should address all components of the question with a 600-word limit.
Learning Outcomes
1. Evaluate the effectiveness of lean operations in operations management.
2. Evaluate the principles of lean operations.
3. Analyze how lean methods improve quality.
Readings
Required:
• Chapter 14 & Supplement to Chapter 14 in Operations Management
• Chapter 14 & Supplement to Chapter 14 PowerPoint Presentations
• Balinado, J.R.O., & Prasetyo, Y.T. (2020).The impact of 5s lean tool to service
operation: A case study in Toyota Dasmarinas-Cavite service operations. ICIBE, 185190.
Recommended:
• Carranza Inga, I., Villayzan Palomino, E., Altamirano, E., & del Carpio, C.
(2021). Improvement model based on four lean manufacturing techniques to increase
productivity in metalworking company. IEIM, 95-99.
• Kęsek, M., Bogacz, P., & Migza, M. (2023). Study on the Usefulness of Lean
Management Tools and Techniques in Coal Mines in Poland. Energies (19961073),
16(21), 7240.
JIT and Lean
Operations
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior
written consent of McGraw-Hill Education.
14-1
You should be able to:
LO 14.1
LO 14.2
LO 14.3
LO 14.4
LO 14.5
LO 14.6
Explain the terms lean operations and JIT
Describe the main characteristics of lean systems
List the five principles of the way lean systems function
List some of the benefits and some of the risks of lean operation
Describe the Toyota Production System (TPS)
List the three goals of a lean system and explain the importance of
each
LO 14.7 List the eight wastes according to lean philosophy
LO 14.8 Identify and briefly discuss the four building blocks of a lean
production system
LO 14.9 Describe key lean improvement tools
LO 14.10 Outline considerations for successful conversion from a traditional
system to a lean system
LO 14.11 Describe some of the obstacles to lean success
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-2
Lean operation
A flexible system of operation that uses considerably
less resources than a traditional system
Tend to achieve
Greater productivity
Lower costs
Shorter cycle times
Higher quality
Just-in-Time
A highly coordinated processing system in which goods
move through the system, and services are performed,
just as they are needed
LO 14.1
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-3
A number of characteristics are commonly found in
lean systems:
Waste reduction
Continuous improvement
Use of teams
Work cells
Visual controls
High quality
Minimal inventory
Output only to match demand
Quick changeovers
Small lot sizes
Lean culture
LO 14.2
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-4
Five principles embody the way lean systems
function:
1.
2.
3.
4.
5.
LO 14.3
Identify customer values
Focus on processes that create value
Eliminate waste to create “flow”
Produce only according to customer demand
Strive for perfection
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-5
Key benefits
Reduced waste
Lower costs
Increased quality
Reduced cycle time
Increased flexibility
Increased productivity
Critical risks
Increased stress on workers
Fewer resources available if problems occur
Supply chain disruptions can halt operations
LO 14.4
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-6
Lean operations began as lean manufacturing, also known
as JIT, in the mid-1900s
Developed by Taiichi Ohno and Shigeo Ohno of Toyota
Focus was on eliminating all waste from every aspect of the process
Waste is viewed as anything that interferes with, or does not add
value to, the process of producing automobiles
Many terms used by Toyota, such as Kanban, Kaizen, and Muda, are
commonly used industry wide.
LO 14.5
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-7
The ultimate goal:
Achieve a balanced system–
One that achieves a smooth, rapid flow of materials and/or
work through the system
LO 14.6
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-8
The degree to which lean’s ultimate goal is achieved
depends upon how well its supporting goals are
achieved:
Eliminate disruptions
2. Make the system flexible
3. Eliminate waste, especially excess inventory
1.
LO 14.6
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-9
Waste
Represents unproductive resources
Eight sources of waste in lean systems:
1. Excess inventory
2. Overproduction
3. Waiting time
4. Unnecessary transporting
5. Processing waste
6. Inefficient work methods
7. Product defects
8. Underused people
LO 14.7
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-10
The kaizen philosophy for attacking waste is based upon these ideas:
1. Waste is the enemy, and to eliminate waste it is necessary to get the hands dirty
2. Improvement should be done gradually and continuously; the goal is not big
improvements done intermittently
3. Everyone should be involved
4. Kaizen is built on a cheap strategy, and it does not require spending great sums on
technology or consultants
5. It can be applied everywhere
6. It is supported by a visual system
7. It focuses attention where value is created
8. It is process oriented
9. It stresses that the main effort for improvement should come from new thinking and
a new work style
10. The essence of organizational learning is to learn while doing
LO 14.7
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-11
Product design
Process design
Personnel/organizational elements
Manufacturing planning and control
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-12
Four elements of product design important for lean
systems:
Standard parts
2. Modular design
3. Highly capable systems with quality built in
4. Concurrent engineering
1.
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-13
Eight aspects of process design that are important for
lean systems:
1.
2.
3.
4.
5.
6.
7.
8.
LO 14.8
Small lot sizes
Setup time reduction
Manufacturing cells
Quality improvement
Production flexibility
A balanced system
Little inventory storage
Fail-safe methods
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-14
In the lean philosophy, the ideal lot size is one
Benefits of small lot size
Reduced in-process inventory
Lower carrying costs
Less storage space is necessary
Inspection and rework costs are less when problems with quality do
occur
Permits greater flexibility in scheduling
Less inventory to ‘work off’ before implementing product
improvements
Increased visibility of problems
Increased ease of balancing operations
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-15
Small lot sizes and changing product mixes require frequent
setups
Unless these are quick and relatively inexpensive, they can be
prohibitive
Setup time reduction requires deliberate improvement efforts
Single-minute exchange of die (SMED)
A system for reducing changeover time
Group technology may be used to reduce setup time by capitalizing on
similarities in recurring operations
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-16
One characteristic of lean production systems is
multiple manufacturing cells
Benefits include
Reduced changeover times
High equipment utilization
Ease of cross-training workers
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-17
Quality defects during the process can disrupt the
orderly flow of work
Autonomation (jidoka)
Automatic detection of defects during production
Two mechanisms are employed
1.
2.
LO 14.8
One for detecting defects when they occur
Another for stopping production to correct the cause of the
defects
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-18
Guidelines for increasing flexibility
1.
2.
3.
4.
5.
6.
LO 14.8
Reduce downtime due to changeovers by reducing changeover time
Use preventive maintenance on key equipment to reduce breakdowns and
downtime
Cross-train workers so they can help when bottlenecks occur or other
workers are absent
Use many small units of capacity; many small cells make it easier to shift
capacity temporarily and to add or subtract capacity
Use off-line buffers. Store infrequently used safety stock away from the
production area
Reserve capacity for important customers
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-19
Takt time
The cycle time needed to match customer demand for final product
Sometimes referred to as the heartbeat of a lean system
Takt time is often set for a work shift
Procedure:
1.
2.
3.
LO 14.8
Determine the net time available per shift
If there is more than one shift per day, multiply the net time by
the number of shifts
Compute the takt time by dividing the net available time by
demand
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-20
Given the following information, compute the takt time: Total time per shift is
480 minutes per day, and there are two shifts per day. There are two 20-minute
rest breaks and a 30-minute lunch break per shift. Daily demand is 80 units.
1. Compute net time available per shift:
Total time
480 minutes
Rest breaks
−40 minutes
Lunch
−30 minutes
= 410 minutes per shift
2. Compute the net time available per day:
= 410 minutes per shift × 2shifts/day = 820 minutes per day
3. Compute the takt time:
Takt time = Net time available per day / Daily demand
= 820 / 80
= 10.25 minutes per cycle
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-21
Lean systems are designed to minimize inventory
storage
Inventories are buffers that tend to cover up recurring problems
that are never resolved
Partly because they are not obvious
Partly because the presence of inventory makes them seem less
serious
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-22
Poka-yoke (Fail-safing)
Building safeguards into a process to reduce or eliminate
the potential for errors during a process
Examples:
Electric breakers
Seatbelt fastener warnings
ATMs that signal if a card is left in a machine
Designing parts that can only be assembled in the correct
position
Electrical fuses and circuit breakers that interrupt electrical
supply if a circuit is overloaded
Detectors at department stores that signal if a monitoring tag
hasn’t been removed from an item
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-23
Five personnel/organizational elements that are
important for lean systems:
1.
2.
3.
4.
5.
LO 14.8
Workers as assets
Cross-trained workers
Continuous improvement
Cost accounting
Leadership/project management
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-24
Workers as assets
Well-trained and motivated workers are the heart of the
lean system
They are given greater authority to make decisions, but more
is expected of them
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-25
Cross-trained workers
Workers are trained to perform several parts of a process
and operate a variety of machines
Facilitates flexibility
Helps in line balancing
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-26
Continuous improvement
Workers in lean systems have greater responsibility for
quality, and they are expected to be involved in problem
solving and continuous improvement
Lean workers receive training in
Statistical process control
Quality improvement
Problem solving
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-27
Cost accounting
Activity-based costing
Allocation of overhead to specific jobs based on their
percentage of activities
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-28
Leadership/project management
Managers are expected to be leaders and facilitators, not
order givers
Lean systems encourage two-way communication
between workers and managers
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-29
Seven elements of manufacturing planning and
control (MPC) are particularly important for lean
system:
1.
2.
3.
4.
5.
6.
7.
LO 14.8
Level loading
Pull systems
Visual systems
Limited work-in-process (WIP)
Close vendor relationships
Reduced transaction processing
Preventive maintenance and housekeeping
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-30
Lean systems place a strong emphasis on
achieving stable, level daily mix schedules
MPS – developed to provide level capacity loading
Mixed model scheduling
Three issues need to be resolved
What is the appropriate product sequence to use?
How many times should the sequence be repeated daily?
How many units of each model should be produced in each
cycle?
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-31
Push system
Work is pushed to the next station as it is completed
Pull system
A workstation pulls output from the preceding
workstation as it is needed
Output of the final operation is pulled by customer
demand or the master schedule
Pull systems are not appropriate for all operations
Large variations in volume, product mix, or product design
will undermine the system
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-32
Kanban
Card or other device that communicates demand for work or
materials from the preceding station
Kanban is the Japanese word meaning “signal” or “visible record”
Paperless production control system
Authority to pull, or produce, comes from a downstream
process
Two main types of kanbans:
LO 14.8
1.
Production kanban (p-kanban): signals the need to produce parts
2.
Conveyance kanban (c-kanban): signals the need to deliver parts
to the next work center
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-33
Benefits of lower WIP
Lower carrying costs
Increased flexibility
Aids scheduling
Saves costs of scrap and rework if there are design
changes
Lower cycle-time variability
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-34
Lean systems typically have close relationships
with vendors
They are expected to provide frequent, small deliveries
of high-quality goods
A key feature of many lean systems is the
relatively small number of suppliers used
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-35
Lean systems seek to reduce costs associated with
the ‘hidden factory’:
Logistical transactions
Balancing transactions
Quality transactions
Change transactions
LO 14.8
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-36
Preventive maintenance
Maintaining equipment in good operating condition
and replacing parts that have a tendency to fail before
they actually do fail
Housekeeping
Maintaining a workplace that is clean and free of
unnecessary materials. It involves the following 5
behaviors to make the workplace effective
1.
2.
3.
4.
5.
LO 14.8
Sort
Straighten
Sweep
Standardize
Self-discipline
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-37
Value stream mapping
A visual tool to systematically examine the flows of
materials and information
Its purpose is to help identify waste and opportunities for
improvement
Data collected:
Times
Distances traveled
Mistakes
Inefficient work methods
Waiting times
Information flows
LO 14.9
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-38
5W2H
A method of asking questions about a process that
includes what, why, where, when, who, how, and how
much
Lean and Six Sigma
Lean and Six Sigma can be viewed as two
complementary approaches to process improvement
Lean focuses on eliminating non-value-added activity to
maximize process velocity
Six Sigma seeks to eliminate process variation
Together the two approaches can achieve process flow and
quality
LO 14.9
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-39
1.
Make sure top management is committed and that they know what
will be required
2.
Decide which parts will need the most effort to convert
3.
Obtain support and cooperation of workers
4.
Begin by trying to reduce setup times while maintaining the current
system
5.
Gradually convert operations, begin at the end and work backwards
6.
Convert suppliers to JIT
7.
Prepare for obstacles
LO 14.10
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-40
1.
Management may not be fully committed or willing to
devote the necessary resources to conversion
2.
Workers/management may not be cooperative
3.
It can be difficult to change the organizational culture to
one consistent with the lean philosophy
4. Suppliers may resist
LO 14.11
Copyright ©2021 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
14-41
Purchase answer to see full
attachment