Need this assignment completed
PM/570 v1
Risk Register Template
PM/570 v1
Page 2 of 2
Risk Register Template
Complete the table below based on your chosen case study. The first column indicates the risk number, which is used as a label to help others easily identify which risk you are addressing. In the second column, write a description of the risk. In the third column, write the owner of the risk. In the fourth column, write what may trigger the risk. In the fifth column, write the strategy to use and the response to the risk. In the sixth column, write the probability of the risk occurring. In the seventh column, write the risk’s level of impact.
Identify 6 to 8 risks from the case study. An example is provided in the first row.
Risk # |
Risk Description |
Risk Owner |
Risk Trigger |
Risk Strategy & Response |
Probability of Occurrence |
Level of Impact |
Ex: |
If there are high winds during the event, then it could cause damage to technical equipment |
Technical Engineer |
Weather reports of high wind |
Mitigate: Identify resources that could potentially protect equipment from damage |
High |
High |
1 |
||||||
2 |
||||||
3 |
||||||
4 |
||||||
5 |
||||||
6 |
||||||
7 |
||||||
8 |
Copyright 2022 by University of Phoenix. All rights reserved.
Copyright 2022 by University of Phoenix. All rights reserved.